For the expansion of the production site of meat processing company Vion Food Group in Boxtel, we supplied and assembled the steel structures of the new production hall and walkway and the hollow-core slabs.
The steel walkway, which has a length of over 32 metres and a weight of 15 tonnes, connects the production sites.